Retaining Wall Reconstruction Completed

Hansford Construction has completed an 18-metre retaining wall reconstruction in Axminster, including new concrete footings, reinforced concrete, and improved drainage — all delivered safely within a 12-day road closure.
Silage Clamp Construction – North Devon

Hansford Construction recently completed a 6,500m² silage clamp in North Devon.
Landslip Stabilisation – Cobb Road, Lyme Regis

A major landslip on Cobb Road in Lyme Regis required urgent stabilisation to protect nearby properties and the public highway.
Silostop Agri Wall System – Barfoots Energy, Bognor Regis

At Barfoots Energy in Bognor Regis, Hansford Construction installed a new Silostop Agri sloped wall system, replacing the site’s existing silage clamp.