Silage Clamp Construction & Surfacing – North Devon
Hansford Construction recently completed a 6,500m² silage clamp in North Devon, delivering a full rebuild from the ground up.
The works included demolition of existing structures, on-site crushing and reuse of materials, and installation of a new Silostop sloped wall system. The project also involved importing Type 1 aggregate, grading with GPS-controlled machinery, and completing with tarmac surfacing for a long-lasting, compliant finish.
Completed on schedule, this project highlights our team’s ability to deliver high-quality agricultural groundworks with an emphasis on efficiency and sustainability.
Project Summary
- Location: North Devon
- Sector: Agricultural
- Duration: 6 weeks
Demolition & Site Clearance
Safe removal of existing clamp structures and site preparation.
Groundworks & Civil Engineering
Foundation works, Silostop system installation, and final surfacing.
Haulage & Aggregates
Material import and grading with GPS-enabled equipment.
Recycling & Sustainability
On-site crushing and reuse to reduce waste.